Price last checked Oct 24, 2026. It may have changed, so confirm on the store's page. We earn a commission on purchases (details).
Davies Non-Drip Epoxy High-performance, hybrid polymer-based adhesive A 100% solids high performance two-pack epoxy that provides an ultra durable and tough bond in a variety of substrates. This versatile product is easy to mix and use in industrial, construction and marine applications. It is specially formulated with microsphere lightweight filler for easy mixing and application enhancing its non-drip property. RECOMMENDED USE Gap Filler Davies NON-DRIP EPOXY is suitable for sealing gaps, dents, and cracks between surfaces in walls and ceilings made of cement board, gypsum board, plywood, and other materials. Concrete Repair Ideal for repairing cracks, imperfections, and rough surfaces in concrete walls, ceilings, and floors. Metal Repair Recommended for filling gaps in metal substrates, such as pitted metal surfaces, joints, and spot-welded stairs, railings, fences, and gates. Adhesive Used as a bonding adhesive to create a strong attachment for many hard surfaces, including dry or damp concrete, metal, plastic, wood, and glass. FEATURES - Lightweight for easy mixing and application - Excellent adhesion to various substrates - Fast drying with very good sandability TECHNICAL DATA Type: Epoxy-Polyamide Finish: Flat Color: Gray Non-Volatile Content: 100% Pack Sizes: 2 x ¼-Liter set 2 x 1-Liter set 2 x 4-Liter set Shelf Life: One year when stored in dry and cool conditions APPLICATION Application Tool: Spatula / Putty Knife Mix Ratio: 1:1 by volume Pot Life @ 28°C: 1½ - 2 hours Recommended DFT (Dry Film Thickness): 1-8 mm Practical Coverage (for a 2x4-Liter set): 1 mm thick → 8 sqm 2 mm thick → 4 sqm 4 mm thick → 2 sqm 8 mm thick → 1 sqm Recoating Interval: 1 - 1½ hours Drying Time: 3-4 hours Clean-Up: Use DV-95 DVIES Epoxy Reducer PRODUCT PREPARATION Mix equal volumes of Part A and Part B. Stir thoroughly for 2-3 minutes, depending on the amount, using a spatula. Mix only the quantity needed to be applied within 90 minutes after thorough mixing. STORAG